Factory HVAC and Industrial Ventilation in Egypt

For investors and manufacturers setting up in Egypt: ventilation for production halls, cooling where people work, precise air conditioning for critical rooms, and comfort systems for offices and staff housing. النسخة العربية: تكييف وتهوية المصانع

Short answer

El Shora Cooling Solutions designs, supplies and installs HVAC and industrial ventilation for factories, warehouses and industrial projects in Egypt. The approach is to separate the process load from the building load: remove heat at its source with local exhaust, cool the people rather than the whole hall with spot cooling, and air-condition only critical rooms such as quality labs and server rooms. Administration buildings get VRF or ducted systems and staff housing gets split units. Equipment is Carrier, Midea and BVN on Egypt's 380 V / 50 Hz supply; studies and quotations are free and can be issued in English — +20 2 3691 4695.

Content last reviewed: 18 November 2026

Process load vs. building load

In an ordinary building the heat comes from the weather, the sun, the walls and the people. In a factory you add the process load: all the energy the machines consume ends up as heat inside the hall, and in many halls this is several times the building load.

Treating both with one large air-conditioning system means a huge capacity and an endless running cost — and the workers next to the machine still feel hot, because the heat is produced at one point and the system only treats it after it has spread.

The better method: extract heat at its source, cool the people, not the building, and air-condition only the critical zones.

What we deliver in industrial sites

ScopeWhat it means
Production-hall ventilationAir-change rate calculated for the activity and contaminants; exhaust and make-up air designed together to balance pressure.
Local exhaust at the heat sourceHoods over ovens, hot machines, welding and painting lines — heat and fumes are captured before they spread.
Spot cooling for work stationsCooled air directed at the work stations instead of cooling the full volume.
Critical roomsQuality rooms, laboratories, server and control rooms: independent precise air conditioning that runs all year.
Administration buildingVRF or concealed ducted systems, designed separately from the hall. VRF systems
Warehouses and raw-material storesRemoving heat trapped under the roof and controlling humidity for sensitive stock.
Staff accommodationCarrier and Midea split units supplied and installed in quantity.
Large single spacesCarrier DX packaged and ducted-split units, and chilled-water systems with fan coil units. Fan coil units

Five things that are different in a factory

  • Continuous operation. A unit running 24 hours is not the same as one running 8. We favour systems with more than one compressor, so that if one stops the others carry part of the load, and we leave a capacity margin.
  • Dust and contaminants. Industrial air carries particles that stick to coils. Washing cycles are more frequent and protective fin coating is advised near emission sources.
  • Voltage stability. Voltage swings shorten the life of compressors and control boards; voltage protection is written as a clear item in the bill of quantities where the site needs it.
  • Downtime is lost production. Response time is written into the contract.
  • Safety requirements. Activities producing flammable fumes or dust have requirements for exhaust routes and duct materials, reviewed before design.

How the industrial study is done

  1. List the heat sources: machines, their power and operating hours.
  2. Define the zones and what each needs: production (ventilation), quality (precise cooling), administration (comfort), storage (humidity).
  3. Calculate the ventilation: air changes for the activity, with exhaust and make-up air designed together.
  4. Decide what really needs air conditioning and what ventilation alone can solve — the biggest saving in the project.
  5. Select equipment for the real site conditions — ambient temperature, dust and voltage — with a safety margin.
  6. Agree the operation and maintenance contract with the design, not after it: visit schedule, spare-parts stock and written response time.

For procurement and finance teams

  • Vendor registration documents ready: commercial register, tax card and VAT certificate.
  • Tax invoices issued for companies.
  • Payment by bank transfer, cheque or cash.
  • Published payment policy, the same for every client: equipment 100% on contract; works 50% on contract, 30% at start of works and 20% at handover. Payment policy (Arabic).
  • Itemised bill of quantities: an item that is not written is not priced, so there are no surprises mid-project.

Frequently asked questions

Should a production hall be fully air-conditioned?

Usually not. In many halls the heat from machines is several times the heat from the building itself. Removing heat at its source with local exhaust, cooling the work stations, and air-conditioning only critical rooms gives better comfort for a fraction of the running cost of cooling the whole volume.

What do you need from us to start a factory study?

A list of machines with their power and operating hours, the layout drawings with ceiling heights, the activity in each zone and any contaminants, and the electrical supply available. A site visit follows.

Which power supply should equipment be specified for in Egypt?

220 V single-phase and 380 V three-phase at 50 Hz. Larger DX units and VRF outdoor units run on 380 V three-phase.

Do you work in industrial zones outside Cairo?

Yes. Projects and supply for companies are delivered across Egypt, including 6th of October, 10th of Ramadan, Sadat City, El Obour, Borg El Arab and Alexandria, and the Ain Sokhna and Suez Canal area.

Can you also air-condition the administration building and the staff housing?

Yes. Offices inside a factory have a normal load and are served by VRF or concealed ducted units, designed separately from the hall. Staff accommodation is normally fitted with Carrier or Midea split units supplied in quantity.

How is downtime handled after handover?

In industrial sites the response time is a contract item, not a verbal promise. It is written into the maintenance contract, and for remote sites we recommend keeping consumable spare parts on site.

Company profile (PDF)

One page to forward to your team, your procurement department or your interpreter.

Download the company profile (PDF)

Send us your machine list and layout

We reply with the questions that matter, schedule a site visit and send a written study and proposal in English. Phone +20 2 3691 4695 · WhatsApp +20 110 057 4656 · info@el-shora.com · 1018 El Kafrawy Axis, 4th District, 6th of October City, Giza · Saturday–Thursday 10:00–22:00 (Cairo time).